Basic Info.
Model NO.
AC400-800KW
Maxcapacity
>1000KN
Accuracy Grade
0.5
Load Way
Electronic Load
Loading Method
Dynamic Load
Display
Digital
Control
Computer Control
Weight
500-1000Kg
Power Source
AC380V
Oil Cylinder Position
Under
Product Name
800kw Resistive Load Bank for Generator Testing
Rated Voltage
400VAC, 3 Phase 4 Wire, 50 Hz
Rated Power
800kw
Certificate
ISO9001:2008
Color
Customers′ Requirement
Control Mode
Manual/Software
Duty Cycle
Continuous
Cooling Type
Forced Air Cooling
Structure Type
Portable with Castors and Lugs
Transport Package
Wooden Case
Specification
ISO9001: 2008
Trademark
Triumph Load
Origin
Shijiazhuang, Hebei, China
HS Code
9030390000
Production Capacity
10sets/Month
Product Description
Our service is beyond of products, but the feeling of customers
Compact and Lightweight design that is ideal for moving from job site to job site or within your facility.
Introduction:
It offers the most robust, high-capacity designs in the industry. It is setting the standard with intelligent operator controls, safety indication layouts, adjustable load step resolution, and lightweight designs. It is the perfect solution for regularly scheduled maintenance testing and commissioning of mission-critical standby emergency power systems.
Main features
1. Multiple control mode: (1) manual panel control (2) remote control (3)software control
2. Multiple display function: voltage, current, frequency, power factor, active power, reactive power, apparent power etc.
3. Multiple protection function: overvoltage, overcurrent, overheat, over low blowing rate, blower overheat, blower phase sequence reverse protection, smoke alarm etc.
4. Forced air cooling: industrial heavy duty fan, horizon air intake, upwards outlet, low noise.
5. Power consumption components: made by special alloy resistance, high temperature resisting, high heat dissipation capability, high heat stability, no naked light, safety and reliability. Running temperature is 1/3 of rating.
6. Weather-proof structure: containerized structure provides ultra protection, protection grade higher than IP55.
7. Material and coating: the body adopt cold-rolled steel plate that processed by galvanizing corrosion protection, powder coated and spray paint.
8. Integrated & modularization design: compact structure, easy to installation, maintenance and transportation.
9. Software control: it can test and display voltage, current, frequency, power factor, active power, reactive power, apparent power etc, the test result can be store & print and form all kinds of curve, chart and test report.
Technical Parameters
The Main Application Of The Load Bank
Factory testing of engines generator sets
To reduce "wet stacking" problems
Periodic exercising of stand-by engine generator sets
Load testing of AC power source
On-site acceptance testing
UPS system testing and maintenance
New projects inspection and battery system maintenance
Load optimization in prime power applications
Workshop
Application Case
Package

Compact and Lightweight design that is ideal for moving from job site to job site or within your facility.
Introduction:
It offers the most robust, high-capacity designs in the industry. It is setting the standard with intelligent operator controls, safety indication layouts, adjustable load step resolution, and lightweight designs. It is the perfect solution for regularly scheduled maintenance testing and commissioning of mission-critical standby emergency power systems.
Main features
1. Multiple control mode: (1) manual panel control (2) remote control (3)software control
2. Multiple display function: voltage, current, frequency, power factor, active power, reactive power, apparent power etc.
3. Multiple protection function: overvoltage, overcurrent, overheat, over low blowing rate, blower overheat, blower phase sequence reverse protection, smoke alarm etc.
4. Forced air cooling: industrial heavy duty fan, horizon air intake, upwards outlet, low noise.
5. Power consumption components: made by special alloy resistance, high temperature resisting, high heat dissipation capability, high heat stability, no naked light, safety and reliability. Running temperature is 1/3 of rating.
6. Weather-proof structure: containerized structure provides ultra protection, protection grade higher than IP55.
7. Material and coating: the body adopt cold-rolled steel plate that processed by galvanizing corrosion protection, powder coated and spray paint.
8. Integrated & modularization design: compact structure, easy to installation, maintenance and transportation.
9. Software control: it can test and display voltage, current, frequency, power factor, active power, reactive power, apparent power etc, the test result can be store & print and form all kinds of curve, chart and test report.
Technical Parameters
AC400-800kW Automatic Load Bank | |
Rating Voltage/Frequency | 800Kw at 400VAC, 3 phase 4 wire, 50 Hz, 230V-Ph |
Max Load Power | Resistive load:800kW |
Load Steps | 12 steps, Resistive load:1kW,2kW,2kW,5kW,10kW,10kW,20kW,50kW, 100kW, 200kW, 200kW, 200kW min load step: 1 kW |
PF(Power Factor) | 1 |
Load Accuracy (each step) | ±5% |
Load Accuracy (overall) | 3% |
Display Precision | 0.5 grade |
Control Power | 380VAC, 3 phase 4 wire, 50 Hz, phase voltage220V |
Wire Connection | Load power supply input--"Y" connection Control power supply input--terminal block |
Insulation | F |
Way of Working | Continuous Work |
Cooling | Fan forced cooling, horizontal inlet air and vertical outlet cooling |
Casing Color | Grey(RAL7035) |
Dimensions | 1600 mm*2400mm*2100mm(length*wide*high) |
Weight | About 1300kgs |
Operating Environment Parameter | |
Temperature | -10ºC~+50ºC |
Relative Humidity | ≤95% |
Altitude | ≤2500 meter |
Brands of Main Components | |
Contactor | CHINT |
Fuse | DELIXI |
Alloy Resistance | (self-developed) |
The Main Application Of The Load Bank
Factory testing of engines generator sets
To reduce "wet stacking" problems
Periodic exercising of stand-by engine generator sets
Load testing of AC power source
On-site acceptance testing
UPS system testing and maintenance
New projects inspection and battery system maintenance
Load optimization in prime power applications
Workshop

Application Case

Package

